Introduction block molding machine

Block molding machine can be the product of sand, stone, fly ash, cinder, coal gangue, tailings, ceramic, perlite and other industrial waste processed into a variety of new wall materials. Such as hollow cement block, blind hole brick, standard bricks, etc., without sintering.
Block making machine is to learn the advantages of similar models at home and abroad, Welded Type Cement Silofor the load-bearing brick masonry products, and the development and characteristics of fly ash products, and to consider the production and maintenance conditions and the development of models.
Device Features
A machine to replace the molds can produce hollow block, brick, standard brick and more than 10 different specifications of unburned. Safe and stable, easy to maintain.
Every 25 seconds a standard brick 26, 3744 produced per hour; every 25 seconds a brick 12, 1728 produced per hour; every 25 seconds of a standard block 4, producing 576 per hour.
The core components of precision manufacturing, the use of anti-fatigue design, extending the life of the host.
Strong exciting force, under normal conditions with the intensity ratio of up to 2.5 ~ 15MPa.
Dual-oriented approach and with excellent long bushing to ensure accurate operation, base and key parts of the overall pressure head and die casting, frame made ​​of thick steel and super special welding technology.
Technical Features
Compact block making machine overall structure, reasonable equipment, rotating parts mechanized equipment, accurate and reliable. Reduce labor intensity and improve production efficiency.Mobile Concrete Mixing Plant Upper and lower pressure, directional vibration, frequency brakes, to achieve the effect of forming a high-density, high strength. A machine equipped with different molds can produce different shapes, different sizes of block products. Easy to observe the various parts of the mechanical structure, simple operation, easy maintenance, less prone to failure to ensure that production is operating normally.
(1) block machine is fixed, Taiwan vibration, mechanical stripping, the models advanced and reasonable design, wide range of applications, the use of gear, brake thinking crank magnet surrounded by mold.
(2) the use of four columns, positioning accuracy, balance and stability mold, improving block density, small block flash, good appearance.
(3) mold replacement convenient, simple, and easy maintenance.
The above description is a large, medium-sized automatic block molding machine equipment, in addition to a small block making machine, in general, the size of such a device is defined according to the daily output, Nissan standard bricks in ten thousand or so of equipment, are called small, portable concrete batching plantdue to the overall design of this device is relatively simple, it is also more convenient for users to operate. Large block molding machines generally are based on hydraulic and vibration molding, and the small block making machine vibration molding are generally used, but small devices produced by the product quality is not inferior to large equipment.

2014年5月7日星期三

cement brick machine certain routine maintenance

The basic function of municipal comprehensive care centers have maintenance, and emergency services in three aspects. Which conservation can bear conservation projects within large and medium repair radiation range, all within the jurisdiction of the dry feeder roads, cement brick machine  tunnels and ancillary facilities for maintenance, taking into account certain routine maintenance. Contingency can be disposed of in the range of radiation emergency Paul Chang tasks, within the jurisdiction of all trunk roads, bridges, tunnels and ancillary facilities for rapid repair of severe damage or impede the normal passage of time, restoration and reinforcement, concrete block making machine realization of natural disasters rushed to the scene when emergency within two hours. Has provided vehicle refueling services to passengers, parking, water and other functions.

2014年5月5日星期一

brick making machine and provide comprehensive

Zibo will vigorously implement key industrial restructuring. Gangue brick factory on the city center closed down in accordance with law and the elimination of other counties to implement Clay Brick Making Machine control , shutting down and eliminated. On the outer ring of the city center within a large ceramic enterprises relocated , do not meet the environmental management standard ceramic , tiles , refractories, foundry and concrete mixing stations and other businesses closed down legally banned . Meanwhile, the central city and key business districts thermoelectric integration , implementation of the " big pressure on the small" and alternative power generation . And to accelerate the adjustment of energy structure , ceramic and refractory materials and other production enterprises gradually changed to burn natural gas.railway, highway and water conservancy projects, now intends to invite light throughout the southern and northern interested in the development of applications in the product and a good network of resources, the establishment of limited concrete batching plant and provide comprehensive technical services to ensure the long-term interests of the partners hope to have some money to visit us insight.

2014年4月22日星期二

brick making machine and other equipment

Construction Machinery Industrial Park project since last February construction progressed rapidly since the project a project --- totaling 40,000 square meters of production workshop has been fully completed, the main production of concrete mixers, concrete mixing stations and other equipment. Has entered the pre-production stage and Concrete block machine be formally put into operation. In mixer production workshop, the reporters saw workers chefs are busy welding structural parts. Truck Workshop Director: "Let this production line mainly produces mixers, mixer we are now a production line is expected to reach 50 units per month, is expected to increase production lines in June, can reach 100-150 units per month, the annual output can break 5 billion. "Faced with increasingly fierce market competition, the speed of technological innovation, product development level is the key to restricting the development of enterprises. As "China's construction machinery industry leading enterprises," always attached great importance to scientific and technological research and development, scientific and technological innovation as a business bigger and stronger inexhaustible power. In mixing plant production workshop, the reporters about the situation in terms of production and product development chief engineer:. "This concrete mixing station from the main intensify energy conservation and environmental protection, research and concrete block machine of prototype products so far, this product has begun to model, and the next step, we will intensify efforts to develop this product. "product innovation for enterprises to win the broader market. Currently, the project is about to be launched the second phase, after the completion of all projects, the capacity of the truck, concrete mixers, concrete mixing stations and other equipment 10,000 units, the annual output value of 6 billion yuan, profits of 500 million yuan.

2014年4月13日星期日

cement brick machine construction machinery industry

concrete brick machine  of golden calm XCMG heavy gray , smooth simple curve shape, new paint excavator themselves. After repeated comparison test a few months , digging machine new look is finalized , and switching into the bulk phase . The new paint scheme makes digging machine series modeling richer, more prominent features of the series , reflects a distinctive brand image digging machine
1-4 months, the construction machinery industry in the overall weakness of the situation , technological innovation marketing ideas , multi-channel information gathering requirements , careful cultivation season market , asphalt mixing plant sales trend growth , achievements of the cumulative January- April sales an increase of 120% , sales of more than 2 times last year , under production conditions remain unchanged, the production increased by 200% , showing good growth . [ More >> ]
May 31 , with the Asia-Pacific region ,concrete batch plants the rapid development of business in China, direct way to provide customers with more convenient services . In 2012, Tianjin customers D1320 super big rig through long-distance pipelines , in the great assistance of technical personnel, excavation of the pipeline diameter 1016mm, distance of 1645m, once again rewritten the trenchless history.

2014年4月11日星期五

Specification asphalt mixing plant operation vocational skills

China Construction Machinery Industry Association branch chairman Ji Guang Road Machinery was said operator in the event of a security incident operation, if no operating license, the insurance company will therefore be rejected claims, operator 's interests can not be guaranteed.
There is no uniform training certification units , engineering machinery operating permits seems to be back to 1999, the industry self- certification .
Huanggang Macheng Highway loader operator Wang Ligang told reporters that he previously held the yujie Concrete Batching Machine issued operating permits , as engaged in transportation construction , he deliberately replaced by the Ministry of Labor and Social Security manpower and operating certificate, he thought that this documents more general , more authoritative .
Ji Guang was led by the China Construction Machinery Industry Association of Road Machinery Branch , for many years in the specification asphalt mixing plant operation on vocational skills for their hard work . He explained that the club and the Ministry of Human Resources and construction machinery , leveraging the country 11 asphalt mixing plant manufacturing enterprises , the establishment of asphalt mixing plant vocational skills training site identification and scheduling materials, trained operator exam will receive the personnel and the Ministry of labor and Social Security issued the certificate . Certificate of elementary, intermediate, advanced , technicians and senior technicians five levels. Holds a senior technician qualification certificate operator , but also in overseas " fishing for money ."

2014年4月8日星期二

Concrete mixing stations have included concrete mixer

We all know that there are concrete mixing station contains concrete mixer , batching machine , consoles and other related equipment, although the device performance is important , we also have a strict quality control system to ensure the use of equipment, but a newly concrete mixer with hopper from the appearance this equipment must feel on looking good, shiny shiny in order to attract more customers.
Work is very important , one can make the device look better , on the other hand also played a device to prevent corrosion , avoid rusting equipment . Because many concrete mixing station equipment are based on material made of steel , do not use protective measures , then the long-term exposure to air is very easy to rust , late and then deal with these things is very troublesome, we used concrete mixer just to let it bring us convenience . A layer of paint to spray concrete mixer just to solve the above problems , the paint will be separated from the steel and air , the protective layer is a layer of good , making the machine is not easy to rust or corrode !
The second reason is beautiful, concrete mixing machines the beautiful appearance of no real quality to it , but with the beautiful appearance plus good quality concrete mixing station will be more likable ! Steel is no variety of colors , looks very beautiful, the user can be coated with paint according to their own preferences, make concrete mixer overall more beautiful !

2014年3月27日星期四

block making machine Special note

1 In order to ensure the YUJIE concrete block making machine normal use of hollow blocks or hollow brick quality and mold their raw aggregates (gravel, stone, etc.) must be less than the maximum diameter of 10mm, must also ensure that aggregate (gravel, stone, etc.) the maximum particle size no larger than the smallest hollow blocks or hollow brick ribs (walls) thick 1/2.
(2) To ensure the quality of YUJIE concrete brick machine road blocks, and the use of powder as the main aggregates must strictly ensure that the fine powder dust content should be ≤ 20%, otherwise pavers molding surface cracks may appear and cracks.

2014年3月21日星期五

concrete block machine features

Block machine equipment uses a closed belt conveyor, strict control of small semi-storage material quantity, so as to send with the use of concrete to prevent the effects of aftershocks and liquefaction in advance to ensure product strength. Unique cutting and broken arch device quickly and evenly so that the material into the mold box; special double-ended synthesis output vibration technology, reasonable layout vibrator so exciting force evenly distributed in the shaker. To ensure that the product weight, strength, consistency. Compact overall structure of YUJIE concrete block making machine equipment, reasonable equipment, rotating parts mechanized equipment, accurate and reliable. Reduce labor intensity and improve production efficiency. Upper and lower pressure, directional vibration, frequency brakes, to achieve the effect of forming a high-density, high strength. A machine equipped with different molds can produce different shapes, different sizes of block products. Easy to observe the various parts of the mechanical structure, simple operation, easy maintenance, less prone to failure to ensure that production is operating normally.

2014年3月13日星期四

brick making machine project management


And organizations to improve the system of concrete mixing station
Currently , the country has 26 provinces, local conditions , the preparation of the province's " Construction standardized YUJIE protable concrete mixer ." Jiangsu Province, focusing on top-level design , organized a " modern project management case studies " from the six aspects of the design , bidding, project management and supervision services and put forward specific requirements, research to develop a " Design Guide ", " tender document YUJIE construction elevator " and " supervisory guidance" 7 construction standardization supporting documents . Improve and strengthen the organization of the system, in order to further carry out the construction of standardization has laid a good foundation.

2014年3月3日星期一

brick making machine construction management focus


Since Xiamen meetings throughout the transport sector to respond positively to the Ministry of deployment requirements , to accelerate the implementation of modern project management , carry out YUJIE protable concrete mixer standardization activities as a key highway construction management, and gradually improve the system construction , engineering and quality steadily improved, economic gradually revealed significant improvement in the image of the site , the construction market has become increasingly standardized.
According to the Ministry of Supervision Bureau aggregated quality sampling data , the second half of 2011 compared with the first half of 2010 , the overall pass rate sampling index rose by 0.6 percentage points highway , bridge projects where the overall pass rate rose to 92.7%, 89.4% , YUJIE twin-shaft concrete mixer pass rate of reinforced protective layer thickness is correspondingly increased by 3.1 percentage points. Maanshan Bridge by conducting standardization activities , 2010 to 2012 reinforced protective layer thickness were passing rate of 85.2% , 89.3% and 92.5% pass rate increased year by year.

2014年2月25日星期二

business skills describe concrete block making machine


Beginning in 2006, participated in the preparation of pre- Heng Gui highway ordered as a manager , responsible for directing the high-speed line construction Kwai Heng . Highway construction in his career, Heng Gui speed is the seventh article , with a wealth of experience , business skills describe him, is not an exaggeration .
Together with the balance consisting of YUJIE construction elevator   management team , also in the construction of roads , especially highways experienced, skilled craftsmen, the oldest team in the upcoming retirement of the Discipline Committee Yan Yuanlin , half my life has stood at the front line of highway construction the youngest deputy pottery may YUJIE protable concrete mixer  been in the front line fighting for road construction for 14 years , participated in the four highway construction .

2014年2月17日星期一

concrete block making machine the capital markets to refinance

As of the end of June 2012 , China 98.7 billion yuan in bank loans , 888 million was unsecured. Similarly, the end of 2011 ,YUJIE bituminous mixing plant yuan in bank loans , there are close to 90% of unsecured loans. The above China Building Materials management , told reporters that despite the large short-term loans , but the Chinese building materials debt is not a problem . " First, the company has sufficient bank credit , and second, YUJIE concrete block making machine a good operating cash flow activities " and "is still scheduled to push forward the work of the capital markets to refinance ."
China continues to expand the scale of building materials .

2014年2月14日星期五

brick making machine even exceeding

Despite excessive chloride sand , with its ready-mix concrete to set out not necessarily exceeded ; third , even exceeding the ready-mix concrete used in the project , is also handling the pace of YUJIE bituminous mixing plant and punishments .
According to reports , the current of chlorine ions are not identified as excessive force sampling project . "There is no delineation of the project required detection of chloride ions , so the national standard certificate , we just have a suspicion mixing station premises and site sampling and core- held to determine whether the excessive chlorine ions ," JSS Spiral Belt Concrete Mixer hinted at the present cases each quarter Shenzhen line search time , there is suspicion to have the title , and then held without sampling schedule .

2014年2月10日星期一

According to concrete block making machine


China's building materials such "borrow , mergers and acquisitions to
expand, then borrow money , and then expand " model has been questioned by
investors .
Multinational investment bank YUJIE concrete block making machine report pointed out at the end of last
year , China 's growth model building requires its return to the capital
markets every few years , if the issue of JS Series Concrete Mixer vicious cycle of debt
expansion and shares , there is no other way to keep growing. Therefore, the
bank maintained the China Building Materials " underperform " rating.

2014年1月20日星期一

Improve the rate of mechanization cleaning tower crane


According to preliminary data provided by the municipal environmental protection department in the city's main source of PM2.5 in urban dust accounted for about 17 percent , after accounting ranked " coal dust" and "small concrete mixer exhaust dust ." This also explains to some extent , urban dust pollution has become the third largest atmospheric environmental quality "killer ."
Therefore, this year the city will strictly control dust pollution. In the control of construction dust , the lump concrete mixer with lift  be implemented in the city district management, construction site to build on 612 ledger , the implementation of green building site construction to achieve standardized management ; increased sediment transport vehicle management, strictly regulate sediment transport order.

2014年1月15日星期三

concrete batch plants established by the Commissioner of the Ministry of position


 The presence of station construction, Lacy PMO project in strict accordance with uniform standards established by the Ministry and the Ministry of Supervision position covers a building area be required concrete batching plant manufacturer consider the ease of construction , transport facilities, whether safety, environmental protection , the availability of reliable communication conditions , their resident 's electricity, environment , accommodation and so do the detailed requirements , and even curtains with little details such as what color are taken into account .
Total length of about 126 km of highway Lacy , ready mix concrete plants beginning of construction , the number of bridge and tunnel construction are faced with more expected to be a shortage of material , construction and small venues , forest fire situation is grim , and many other difficult conditions .

2014年1月6日星期一

Quality defects insisted rework


In construction management , transportation disaster reconstruction projects do require that each person participating in the construction put "quality is extremely heavy ," and awareness rooted in the hearts , earnestly implement the responsibility for the quality , stationary concrete batching plant refine the design , construction, supervision and unit owners responsibility for the quality objectives , so hierarchical management , progressively responsible , and proceed from the small office to control every good and every construction process quality indicators , increase the frequency of site inspection and found quality problems and quality defects insisted rework. Zhou Feng along the highway towards the Bailong wiring , along a total length concrete mixing truck of highway nearly three kilometers of flooding retaining wall project . Moreover, the frequent rains in Zhouqu , rainy Bailong River water flow , flooding retaining wall construction difficulty is particularly great. Post-disaster reconstruction projects to organize transport All units actively exploring new methods of construction , and the organization to observe and learn from each other good practices and experiences .