2013年9月23日星期一

Rinse mixer hose comes into the hopper

1, the hydraulic system pressure should be consistent with the operating instructions shall not be adjusted. Hydraulic oil and fuel oil shall comply with the original requirements.
2, concrete mixer loading, before mixing tube drained residual water and debris. During transport to keep the rotation, to prevent segregation of concrete. Concrete mixer truck access to the site and unloading should be preceded by the mixing drum at full speed to Concrete mixer rotation for 1-2 minutes, then invert discharge. Reversal, you should not turn the mixing tube parked.
3, the ambient temperature is above +25 degrees Celsius, from the loading, transport, unloading duration to not more than 60 minutes, the ambient temperature is lower than +25 degrees Celsius, the time must not exceed 90 minutes.
4, winter construction, you should make sure: concrete mixing machine the icing; work when mixed carefully excluded from the barrel and residual water within the water supply system, turn off the pump switch, the control handle to the "stop" position.

没有评论:

发表评论